WEEKLY ROADWORK REPORT July 2-8, 2023

Eastbound lane closure

Bowie County I-30 – From FM 989 to Arkansas state line, reconstructing and widening highway, placing concrete barrier in median I-30 – From FM 989 to FM 3419, extension of frontage roads. FM 2148 closed under I-30 bridge I-30 - Eastbound from FM 2253 past FM 3419, bridge work. Lane closure as needed SH 8 – At Sulphur River, replacing bridges SH 98 – At Anderson Creek, bridge replacement Camp County SL 255 – From FM 1520 to US 271, constructing highway, County Road 2120 detoured SL 179 - From SH 11 to US 271. Seal coat operations, lane closures Cass County SH 8 – At Sulphur River, replacing bridges US 67 – Widening bridge at Jennings Slough, lanes open US 59 – From 1.2 miles south of FM 2328N to 1.9 miles south of FM 2328S, resurfacing road, bridge rail improvements US 59 - From SL 236 to FM 3129, resurfacing road, lane closure Harrison County US 59 – At I-20, replacing bridge. US 59 traffic shifted to southbound lanes I-20 – Concrete pavement repairs. Daytime lane closures SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. Roadway open FM 3001 – At Little Cypress Bayou Relief. Replacing bridge. Temporary traffic signals in place, lane closure with two-way traffic I-20 - From US 80 to FM 134. Installing safety barrier cable Morris County I-30 – Eastbound at Exit 178, US 259, ramp rehabilitation.

Panola County US 59 (Loop) – From Business 59 north of Carthage to US 79 east, rehabilitating highway, daytime lane closures SH 149 – 0.8 miles south of SH 315 to US 59. Widening road Titus County US 271 – At Dickson Creek, Big Slough Creek, White Oak Creek & White Oak Creek Relief, replacing bridges FM 1735 - From SH 49 to FM 4000, widening road, closed to through traffic US 67 - From FM 1734 to US 271, seal coat operations. Lane closures FM 1896 - From US 271 to Franklin County line, seal coat operations. Lane closures Upshur County US 271 – From 5.9 miles north of SH 155 to 1.5 miles north of SH 155, resurfacing road US 80 - From Wood County line to 0.3 miles east of SH 155N, resurfacing road

Editor’s note: This is a schedule of work being planned for the dates noted above. Weather conditions and unforeseen problems can cause delays or cancelation of work. For more information about construction projects, contact Heather Deaton, Public Information Officer, TxDOT Atlanta District, 903-799-1306, Heather.Deaton@TxDot.gov