Weekly Roadwork Report

July 10 – July 16, 2022

Bowie County

I-30 – From FM 989 to AR State Line, reconstructing and widening highway, daytime work in median. Motorists should watch for trucks and equipment pulling onto the interstate

I-30 – Westbound at Exit 207/Spur 594, ramp rehabilitation. Exit & entrance ramps closed. Westbound lanes restricted to one lane

I-30 – Eastbound from FM 44, drainage upgrades. Traffic limited to one lane in some areas

SH 8 – At Sulphur River, replacing bridges

SH 98 – At Anderson Creek, bridge replacement. Traffic restricted to one lane with signal lights controlling traffic through work zone

Camp County

SL 255 – From FM 1520 to US 271, constructing highway. County Road 2120 detoured

Cass County

SH 8 – At Sulphur River, replacing bridges

US 67 – Widening bridge at Jennings Slough. Signal lights controlling one-way traffic

Harrison County

I-20 – At US 59 overpass, replacing bridge. US 59 traffic shifted to southbound lanes. I-20 lane closures scheduled for Sunday night 7/10

I-20 – Concrete pavement repairs. Various daytime lane closures, expect delays

I-20 – At Lansing Switch Road, constructing new bridge over interstate. Lansing Switch Road closed to through traffic. Possible lane closures on I-20

SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. Signal lights controlling one-way traffic

US 80 – From Loop 390 to Interstate 20, resurfacing highway. Daytime lane closures, expect delays

CR 2116 – At Haggerty Creek, replacing bridge. Bridge closed to through traffic

US 59 – FM 1186 to Panola County line, installing safety barrier cable. Daily lane closures

Cider Lane, Hallsville – From US 80 to Cal Young Rd. Construct pedestrian ramps & shared use path. Daytime lane closures

Marion County

US 59 – From SH 49 to two miles north of SH 49, repairing and resurfacing highway

CR 3306 – At Mill Creek, replacing bridge. Bridge closed to through traffic

Morris County

SH 49 – From Titus County line to FM 144, repairing and resurfacing highway

Editor’s note: This is a schedule of work being planned for the dates noted above. Weather conditions and unforeseen problems can cause delays or cancelation of work. For more information about construction projects, contact Heather Deaton, Public Information Officer, TxDOT Atlanta District, 903-799-1306, Heather.Deaton@TxDot.gov