Weekly Roadwork Report
Bowie County
I-30 – From FM 989 to AR State Line, reconstructing and widening highway, daytime work in median. Motorists should watch for trucks and equipment pulling onto the interstate
SH 8 – At Sulphur River, replacing bridges
SH 98 – At Anderson Creek, bridge replacement. Traffic restricted to one lane with signal lights controlling traffic through work zone
Camp County
SL 255 – From FM 1520 to US 271, constructing highway. County Road 2120 detoured
Cass County
SH 8 – At Sulphur River, replacing bridges
US 67 – Widening bridge at Jennings Slough. Signal lights controlling one-way traffic
Harrison County
I-20 – At US 59 overpass, replacing bridge. US 59 traffic shifted to southbound lanes
I-20 – At Lansing Switch Road, constructing new bridge over interstate. Lansing Switch Road closed to through traffic. Possible lane closures on I-20
SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. Northbound lanes closed with signal lights controlling one-way traffic
US 80 – From Loop 390 to Interstate 20, resurfacing highway. Possible lane closures
Marion County
US 59 – From SH 49 to two miles north of SH 49, repairing and resurfacing highway. Lane closures, expect delays
US 59 – From Cass County line to 2 miles north of SH 49, installing safety barrier cable. Daily lane closures
Morris County
SH 49 – From Titus County line to FM 144, repairing and resurfacing highway. One-lane, two-way traffic
Panola County
US 59 (Loop) – From Business 59 North of Carthage to US 79 East, rehabilitating highway. Traffic detoured to ramps on eastbound/westbound Loop 59/79. Business 59 open to traffic
US 79 -- From SH 149 to Rusk County line, rehabilitating highway
SH 149 – From US 79 to .8 miles south of SH 315. Lane closures possible during final phase
Titus County
SH 49 – From FM 1735 to Morris County line, repairing and resurfacing highway. One-lane, two-way traffic
SH 49 – From Business 271 to Mount Pleasant city limits, repairing and resurfacing highway. One-lane, two-way traffic
US 271 – At Dickson Creek, Big Slough Creek, White Oak Creek & White Oak Creek Relief. Replacing bridges
Upshur County
US 271 – From 5.9 miles north of SH 155 to 1.5 miles north of SH 155. Resurfacing highway
Editor’s note: This is a schedule of work being planned for the dates noted above. Weather conditions and unforeseen problems can cause delays or cancelation of work. For more information about construction projects, contact Heather Deaton, Public Information Officer, Tx-DOT Atlanta District, 903-799-1306, Heather.Deaton@TxDot.gov
