Weekly Roadwork Report
Bowie County
I-30 – From FM 989 to AR State Line, reconstructing and widening highway, concrete paving in median
I-30 – Westbound at Exit 207/Spur 594, ramp rehabilitation. Exit & entrance ramps closed. Westbound lanes restricted to one lane
I-30 – Eastbound from FM 990, drainage upgrades. Traffic limited to one lane in some areas
SH 8 – At Sulphur River, replacing bridges
SH 98 – At Anderson Creek, bridge replacement. Traffic restricted to one lane with signal lights controlling traffic through work zone
Camp County
SL 255 – From FM 1520 to US 271, constructing highway, County Road 2120 detoured
FM 557 – From Pittsburg city limits to Upshur County line, resurfacing road
FM 557 – From US 271 to E. Pittsburg city limits, resurfacing road
SH 11 – From FM 557 to E. Pittsburg city limits, resurfacing road
FM 556 – From Pittsburg city limits to FM 1519, resurfacing road
Cass County
SH 8 – At Sulphur River, replacing bridges
US 67 – Widening bridge at Jennings Slough, signal lights controlling one-way traffic
Harrison County
I-20 – At US 59 overpass, replacing bridge. US 59 traffic shifted to southbound lanes
I-20 – Concrete pavement repairs. Various daytime lane closures, expect delays
I-20 – At Lansing Switch Road, constructing new bridge over interstate. Lansing Switch Road closed to through traffic. Possible lane closures on I-20
SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. Signal lights controlling one-way traffic
US 80 – From Loop 390 to Interstate 20, resurfacing highway. Daytime lane closures
CR 2116 – At Haggerty Creek, replacing bridge. Bridge closed to through traffic
Cider Lane, Hallsville – From US 80 to Cal Young Road, constructing pedestrian ramps & shared use path. Daytime lane closures
Marion County
US 59 – From SH 49 to two miles north of SH 49, repairing and resurfacing highway
CR 3306 – At Mill Creek, replacing bridge, bridge closed to through traffic
Panola County
US 59 (Loop) – From Business 59 North of Carthage to US 79 East, rehabilitating highway. US 79 traffic shifted to SB lanes at US 59 Loop. US 59 Loop NB entrance ramp closed
CR 224 – At Irons Bayou, replacing bridge. Bridge closed to through traffic
US 59 - From Harrison County line to Loop 149, installing safety barrier cable. Daily lane closures
Titus County
SH 49 – From FM 1735 to Morris County line, repairing and resurfacing highway
SH 49 – From Business 271 to Mount Pleasant city limits, repairing and resurfacing highway, one-lane, two-way traffic
US 271 – At Dickson Creek, Big Slough Creek, White Oak Creek & White Oak Creek Relief, replacing bridges
Upshur County
US 271 – From 5.9 miles north of SH 155 to 1.5 miles north of SH 155, resurfacing road, traffic shifted to southbound lanes
US 259 – From Meddlin Creek to .5 miles south of FM 450, resurfacing road
FM 49 - From FM 1002 to Wood County line, resurfacing road
FM 49 – From FM 1795 to FM 1002, resurfacing road
SH 300 – 0.2 miles south of US 271 to 0.6 miles north of FM 3358, resurfacing road
US 259 – 0.5 miles south of FM 450 to FM 726, resurfacing road
Editor’s note: This is a schedule of work being planned for the dates noted above. Weather conditions and unforeseen problems can cause delays or cancelation of work. For more information about construction projects, contact Heather Deaton, Public Information Officer, TxDOT Atlanta District, 903-799-1306, Heather.Deaton@TxDot.gov
